DEFINITY Enterprise Communications Server Release 6
Maintenance for R6vs/si
555-230-127 Issue 1
August 1997
Maintenance Commands and Trouble-Clearing Aids

Page8-363test maintenance

8
link, reset, and sanity functions on the EPN maintenance circuit pack. The long test resets the EPN maintenance circuit pack, causing the EPNSAT link to be dropped and is destructive.
Feature Intera c tions
The last test in the long test sequence on EPN m aintenance circuit packs drops the EPNSAT link.
1. If no alarms are registe red against the maintenance object then the test seque nce is run only once. The
long
clear
option forces a clear of all alarms if no errors are encountered during testing. The
short clear
option only
clears alarms pertinent to tests in the short sequen ce.
2. Refer to the Report Scheduler an d System Printer feature specifica tion for more details.
Action/Object Qualifier Qualifier Description Permissions Defaults Feature
Interactions
test
maintenance location
short
long
repeat
number
clear
schedule
Physical location of the
maintenance circuit pack: (2-3)
Option for a brief series of
nondestructive diagnostic te sts.
Option for a longer, more
comprehensive series of both
destructive and nondestructive
diagnostic tests.
Number of times each test i n the
sequence is repeated (1-100)
This option causes the te st
sequence (short or long) to repeat
until the alarm (if any) is clea red or
a single test in the sequence fails.1
Command is validated and t hen a
scheduling form displays to
schedule execution of t he
command. The command is then
placed in the command queue and
is executed at the specifi ed time.
The information displayed by the
command is sent to the system
printer instead of the s creen.2
Examples:
test maintenance 2
test maintenance 3 schedule
test maintenance 2 sh
test maintenance 2 l c
init
inads
craft
Test
sequence =
short;
repeat = 1
See below