POINT

Estimation of processing time

The time required for the processing depends on conditions such as OS, data capacity, and file structure. (Reference value)

When the capacity is 4 Mbytes: Around 6 seconds

When the capacity is 12 Mbytes: Around 18 seconds

(5)Precautions for operation

(a)Copying project data

If the Boot source drive and copy destination drive for project data is the same, the project data cannot be copied.

If the drives are the same, cancel the setup.

(b)When project data are copied to the GOT

If OS or project data is copied to the GOT using the SD card or USB memory created with GOT data package acquisition, the utility setting is also copied.

Check each utility setting after copying to the GOT and change the setting according to need.

(c)SD card or USB memory to be used

When performing GOT data package acquisition, do not store other data to the SD card or USB memory. If doing so, the previous data will be unavailable.

 

 

 

 

 

 

 

 

9

 

 

 

 

UTILITY FUNCTION

 

 

 

 

 

 

 

 

 

 

 

10

 

 

COMMUNICATION INTERFACE SETTING

(COMMUNICATION SETTING)

 

 

 

 

 

 

 

 

 

 

 

11

 

 

DISPLAY AND OPERATION SETTINGS

(GOT SET UP)

 

 

 

 

 

 

 

 

 

 

 

12

 

 

CLOCK SETTINGS AND BATTERY STATUS DISPLAY

(TIME SETTING AND DISPLAY)

 

 

 

 

 

 

 

 

 

 

 

13

 

 

FILE DISPLAY AND COPY (PROGRAM/DATA

CONTROL)

 

 

 

 

 

 

 

 

 

 

 

14

 

GOT SELF CHECK

(DEBUG AND SELF

CHECK)

 

 

 

 

 

 

 

 

 

 

 

15

 

 

 

CLEANING DISPLAY

SECTION (CLEAN)

 

 

 

 

 

 

 

 

 

 

 

16

 

INSTALLATION OF

COREOS, BOOTOS

AND STANDARD

 

 

 

 

 

 

13. FILE DISPLAY AND COPY (PROGRAM/DATA CONTROL)

13 - 91

13.2 Various Data Control