1.1.1Rough procedure
The outline procedures before operating GOT and the descriptions of each item are shown below.
1
Install GT Designer3 in the PC.
Create project data.
Wire for the GOT power supply and the controller.
Refer to GT Designer3 Version1 Screen Design Manual (Fundamentals).
Refer to GT Designer3 Version1 Screen Design Manual (Functions).
Refer to GOT1000 Series Connection Manual for GT Works3.
OVERVIEW
2
CONFIGURATION
SYSTEM
3
Wire for the controller power supply and I/O. | Controller manuals |
Turn on the power of GOT and controller.
SPECIFICATIONS
4
Install the OS to GOT.
16. INSTALLATION OF COREOS, BOOTOS AND STANDARD MONITOR OS
Refer to GT Designer3 Version1 Screen Design Manual (Fundamentals).
PARTS NAME
5
Check that the OS is installed to GOT.
Download project data. | Refer to GT Designer3 Version1 Screen Design Manual | |
(Fundamentals). | ||
|
Turn on the controller power and check that the GOT recognizes the controller.
Check that the monitoring is normal.