(1)Connecting target confirmation
Touching [CPU] button carries out the connecting target confirmation communication check.
1.After the CPU communication starts normally, the dialog box mentioned left notifying that it is on checking, until the connecting target confirmation communication ends normally.
2.When the connecting target confirmation communication ends, its result is notified by dialog box. If the connecting target confirmation communication ends normally, the dialog box notifying of the normal termination mentioned left is displayed. Touching [OK] button after confirming the result returns to [I/O check].
If the dialog box mentioned left is displayed after selecting connecting target confirmation or during CPU communication check, confirm the following.
•No misconnection with CPU
( GOT1000 Series Connection Manual for GT Works3)
•No missettings of parameter
( 10.2 Communication Detail Setting)
•No hardware error.
Touching [OK] button after confirming the result returns to [I/O check].
(2)
Touching [Self] carries out the hardware check of
|
|
|
|
|
| 9 |
|
|
| UTILITY FUNCTION |
|
|
|
| |
|
| ||
| 10 |
| |
| COMMUNICATION INTERFACE SETTING | (COMMUNICATION SETTING) |
|
|
|
| |
|
| ||
| 11 |
| |
| DISPLAY AND OPERATION SETTINGS | (GOT SET UP) |
|
|
|
| |
|
| ||
| 12 |
| |
| CLOCK SETTINGS AND BATTERY STATUS DISPLAY | (TIME SETTING AND DISPLAY) |
|
|
|
| |
|
| ||
| 13 |
| |
| FILE DISPLAY AND COPY (PROGRAM/DATA | CONTROL) |
|
|
|
| |
|
| ||
| 14 |
| |
CHECK ANDSELF |
|
|
GT14 (Rear face)
check connector
1. For preparation for the
For this connector, short 2 and 3 pins, 7 and 8 pins and 4 and 6 pins, respectively.
In the communication setting of the GOT utility, set the channel number for the
GOT SELF (DEBUG CHECK) |
| |
|
|
|
15 |
| |
| CLEANING DISPLAY SECTION (CLEAN) |
|
|
|
|
16 |
|
4 3 2
8 7 6
INSTALLATION OF COREOS, BOOTOS AND STANDARD |
14. GOT SELF CHECK (DEBUG AND SELF CHECK) | 14 - 15 |
14.2 Self Check |
|