![](/images/new-backgrounds/1298759/298759207x1.webp)
SVC Tunneling | Basic Configuration and Setup |
|
|
|
|
SVC Tunneling
This section describes how to interconnect two ATM Switches (1 & 2) configured for LAN Emulation with an LE client attached to each, over a PVC connection using a SVC tunneling technique.
|
|
|
|
| |||||||||
|
|
|
|
|
|
|
|
|
|
|
| ||
| ATM |
|
|
|
|
|
|
|
| ATM |
| ||
|
|
|
|
|
|
|
|
|
| ||||
| Switch |
|
|
|
|
|
|
|
| Switch |
| ||
00.n | 000 | 001 | 00.u |
| |||||||||
| (1) |
|
|
| ATM Switch |
|
|
|
| (2) |
| ||
|
|
|
|
|
| (3) |
|
|
|
|
|
|
|
|
|
|
|
|
| (PVC) |
|
|
|
|
|
|
|
|
|
|
|
|
| VPI = 1 |
|
|
|
|
|
|
|
|
|
|
|
|
| Clock: |
|
|
|
|
|
|
|
| PC |
|
|
|
|
|
|
| PC |
| |||
|
|
|
|
|
|
|
|
|
| ||||
| LES/LEC |
|
|
|
|
|
|
|
| LES/MAT |
| ||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 133.205.8.54 |
| ||
133.205.8.39 |
|
|
|
|
|
|
|
| |||||
|
|
|
|
|
|
|
|
Figure 8-1: SVC Tunneling
1. Refer to Figure
2. Set up both LE clients and Switch 3 configurations except for switch interconnections.
3. On Switch 1 and 2, set interface 00 to a NNI port.
4. On Switch 2, set to User Side.
5. On Switch 1 and 2, execute the following commands:
SET tunnel 00 1
SET signal 00 1
SET ILMI 00 1
6. On Switch 1 execute the following command: route add NSAP 47007922 00 1
7. On Switch 2 execute the following command: route add NSAP 47007911 00 1
8. SAVE
NOTE | All signaling, ILMI and SVCs will use VPI and will pass unobstructed through | |
Switch 3. | ||
|
Centillion 1200N ATM Switch User Manual | |
| NTP |