Chapter 2: Installation

Unpack the VTrak storage subsystem (below)

Mount VTrak M500f/i/p in a Rack (page 12)

Mount VTrak M300f/i/p or M200f/i/p in a Rack (page 14)

Install Disk Drives (page 16)

Set Up Network Cable Connections (page 20)

Set Up Serial Cable Connections (page 25)

Connect the Power (page 26)

Unpack the VTrak

The VTrak box contains the following items:

VTrak Unit

Quick Start Guide

Null Modem Cable

Left and right mounting rails

1.0m External VHDCI SCSI cables (2 for M500p/M300p, 1 for M200p)

Screws for disk drives

(36 for M200f/i/p; 52 for M300f/i/p;

64 for M500f/i/p; including 4 spares)

1.5m (4.9 ft) Power cords (2)

CD with SNMP files, Product Manual and Quick Start Guide

Warning

The electronic components within the VTrak disk array are sensitive to damage from Electro-Static Discharge (ESD). Observe appropriate precautions at all times when handling the VTrak or its subassemblies.

Important

Use the following categories of network cables with VTrak:

Cat 6, preferred

Cat 5E, minimum

11

Page 19
Image 19
Promise Technology M500f, M500i, M300p, M500p, M300i, M300f, M200i, M200p, M200f manual Installation, Unpack the VTrak