Chapter 6: Maintenance

Replace SEP – M500f/i/p

The Storage Enclosure Processor (SEP) manages the fans, audible alarm, and battery, and monitors system voltages and cooling functions. No tools are required for this procedure.

Caution

The SEP is NOT a hot-swappable device. Power-down the VTrak before removing it.

Important

Do not replace the SEP based on LED colors alone. Only replace the SEP when directed to do so by Promise Technical Support. See page 299.

To remove and replace the SEP, do the following:

1.Power down the VTrak.

2.Grasp the handle and pull it toward you (above, left).

3.Holding the handle, pull the SEP out of the enclosure (above, center).

4.Gently slide the new SEP into the enclosure.

5.Press on the screen to seat the SEP (above, right). The handle will swing in as the SEP is properly seated.

6.Power up the VTrak.

This completes the Storage Enclosure Processor replacement procedure.

235

Page 243
Image 243
Promise Technology M500i, M300p, M500p, M300i, M300f, M200i, M200p, M200f manual Replace SEP M500f/i/p