FIGURES
Figure 2.1 | Example of Lifting the STP Pump | |
Figure 3.1 | Configuration of the STP Pump | |
Figure 3.2 Installation of the STP Pump to the Vacuum Equipment | ||
Figure 3.3 | STP Pump Installation Positions | |
Figure 3.4 | Positions of the Outlet Port on the Horizontally or Slanted Installed STP Pump .. | |
Figure 3.5 | Example of securing the STP pump (When securing the inlet port with bolts) | |
Figure 3.6 | Example of securing the STP pump |
|
| (When securing the inlet port flange with claw clamps) | |
Figure 3.7 | Example of securing the STP pump |
|
| (When installing the damper in the inlet port flange) | |
Figure 3.8 | Connecting the Purge Port and Emergency Vent. Valve | |
Figure 4.1 | STP Control Unit Front Panel | |
Figure 4.2 | STP Control Unit Rear Panel | |
Figure 4.3 | Inside of the STP Control Unit | |
Figure 4.4 | Peripheral Space of the STP Control Unit | |
Figure 4.5 | Example of Securing the STP Control Unit | |
Figure 4.6 | External Dimensions of Each Cable | |
Figure 4.7 | External Dimensions of he Power Cable | |
Figure 4.8 | How to Secure Primary Power Cable | |
Figure 8.1 | I/O TB2 Remote Output Signal Terminal Block | |
Figure 8.2 | Example of Connecting I/O TB2 R. Pump Terminal | |
Figure 8.3 | Example of Securing the Remote Cable | |
Figure 8.4 DC I/O TB3 Remote Input Signal Terminal Block | ||
Figure 8.5 | START STOP TB5 Remote Input Signal Terminal Block | |
Figure 8.6 | START/STOP TB6 Remote Input Signal Terminal Block | |
Figure 9.1 | Life of the Internal Battery | |
Figure 9.2 Allowable Shelf Life of the Internal Battery | ||
Figure 9.1 | How to Replace the Internal Battery | |
Figure 11.1 | Cross Sectional View of the STP Pump | |
Figure 16.1 | External Appearance of the STP Pump |
|
| (Example: | |
Figure 16.2 | External Appearance of the STP Control Unit | |
Figure 16.3 | Label Affixing Positions for the STP Pump | |
Figure 16.4 | Label Affixing Positions for the STP Control Unit | |
Figure 16.4 | Label Affixing Positions for the Special Accessory |
13