2.2Unpacking the STP Control Unit
Check the following before unpacking the STP control unit.
1)Check the package for bruises, breakage, wetness, etc.
If there is any abnormality/error or it is judged necessary to return the product, contact Seiko Seiki.
2)Check the contents of the package. See Section 16.3, "Accessories."
CAUTION
◇The mass of the STP control unit is approx. 40 kg. Use a crane or appropriate means to lift the STP control unit.
Lift the STP control unit using the two handles attached to the front panel.
◇Observe national laws/regulations, safety standards and so on when lifting the STP control unit.
◇Use a crane or appropriate means sufficient enough to withstand the load when lifting the STP control unit.
◇Always lift the STP control unit in stable places free of excessive shock or vibration to prevent it from shaking or dropping.
◇Have at least two people lift the STP control unit when doing so by hand.
NOTICE
◇It is recommended to keep the packaging materials, such as the corrugated fiberboard container and cushioning material for possible reuse.