2 Unpacking

STP-H600/H1000 Series Instruction Manual

2 Unpacking

2.1Unpacking the STP Pump

Check the following before unpacking the STP pump.

1)Check the package for bruises, breakage, wetness, etc.

If there is any abnormality/error or it is judged necessary to return the product, contact Seiko Seiki.

2)Check the contents of the package. See Section 16.3, "Accessories."

Manual backgroundManual background CAUTION Manual background

The mass of the STP pump is approx. 30 kg. Use a crane or other appropriate means to lift the STP pump.

Lift the STP pump with an eyebolt or a similar tool that uses the fitting hole attached to the inlet port flange.

Lift it with the aid of a suspension tool under the base when installing the STP pump without fitting hole.

Observe national laws/regulations, safety standards and so on when lifting the STP pump.

Use a crane or other appropriate means sufficient enough to withstand the load when lifting the STP pump.

Always lift the STP pump in stable places free of excessive shock or vibration to prevent it from shaking or dropping.

Have at least two people lift the STP pump when doing so by hand.

Manual backgroundNOTICEManual backgroundManual backgroundManual background

Be careful not to scratch the flange of the STP pump.

Before installing the STP pump, check whether or not there are scratches on the surface.

It is recommended to keep the packaging materials, such as the corrugated fiberboard container and cushioning material for possible reuse.

Figure 2.1 Example of Lifting the STP Pump