Spectra Logic 10000 manual Checking for Correct Operation, Performance Test 1 Power Up

Models: 10000

1 136
Download 136 pages 25.74 Kb
Page 55
Image 55
Checking for Correct Operation

Chapter 4. Configuring the Library

Checking for Correct Operation

Two performance checks should be performed on all new libraries after connecting and configuring the library and before performing important backup and restore operations. If either performance check fails, contact Spectra Logic Technical Support.

Performance Test 1: Power Up

When you turn on the library, these three screens should appear in the following order.

The boot code screen displaying the library boot code version number.

The library configuration screen showing the date of manufacture, the serial number, and the SCSI settings for the busses, drives, and library.

The main screen, shown in the following illustration.

Proceed to Performance Test 2 when the main screen appears.

Note: If the library main screen does not appear, there is a SCSI bus conflict. Turn OFF the library and recheck the SCSI IDs and SCSI bus termination. Correct any problems, then retry the test.

Performance Test 2: Confirm SCSI IDs

1.On the main screen, the drive number in the drive box is highlighted for installed drives (in the following illustration, Drives 1 and 3 are installed).

Figure 4-2Drive boxes are highlighted for installed drives.

55

Page 55
Image 55
Spectra Logic 10000 manual Checking for Correct Operation, Performance Test 1 Power Up, Performance Test 2 Confirm SCSI IDs