
Performance Verification
Performance Verification Test
Performance Verification Test
The following verification procedure will verify the Agilent 85330 system in two parts. The first part will verify the operation of the multiple channel controller to make sure that it is controlling the switches and the receiver correctly. The second part will check the switch’s RF performance and to make sure that they are switching correctly.
Setting Up the Equipment
85330 System
Connect the 85330 system to the switch control unit using the correct local control cable. This should be set up the same way that the 85330A system is used in the measurement system (Agilent 85301B/C). Do not connect the Switch Control Units (SCU) to their switches at this time. Do not connect the 85330A to any other instruments in the measurement system. An example of a setup is shown in Figure
Figure 2-1 An Example Performance Verification Setup
85330A Multiple Channel Controller |