Performance Verification

Verifying the RF Switches

Verifying the RF Switches

Switch Setup

This portion of the verification will check the switches to make sure that they are switching correctly. This portion will also test the RF performance of the switches.

1.Turn OFF the multiple channel controller before making any connections.

2.Connect each switch to its switch control unit. Use the supplied switch drive cable.

3.Connect the switch to the network analyzer. An example of this setup is shown in Figure 2-5.Note that all of the switch ports will be tested, so make sure that there is enough room to connect all of the ports to the network analyzer.

4.Turn ON the multiple channel controller.

Figure 2-5 RF Switch Test Setup

85330A Multiple Channel Controller

2-13

Page 43
Image 43
Agilent Technologies 85330A service manual Verifying the RF Switches, Switch Setup