High Frame Installation

Frame Rail Pre-Assembly: (continued)

High Frame Mounting Tube Components. (See Figure 4) These Components are Sitting in approx. position of assembly to illustrate where they are to be when tack welding them. Space is left between them for Illustration only, they will be closer together when assembled.

Also See Figure 3 on previous Page.

Bolts (3 each side)

Angle Mount (2

 

each side)

 

 

Mounting Tube

Frame

(1 each side)

Rail

Mounting Bolt Holes

 

 

(2 each end)

Rear of

 

Frame Rail

Angle Mount

 

 

(2 each side)

Bar Mounting

Front

Strap Cut Off

of

(2 each side)

Frame

 

Locknuts (3 each side)

Rail

Figure 4

Bar Mounting

Straps

 

High Frame and King Post Frame Sub-Assembly. (See Figure 5) The High frame will come with the King Post Sub-Assembly built to it. The 2 Wheel drive and 4 Wheel Drive High frames are different and will not interchange between 2 WD and 4 WD Tractors, the 4 Wheel drive High Frame has the King Post Mounting welded higher up on frame than 2 WD Frame. DO NOT try to use a 2 Wheel drive Frame on 4 Wheel Drive Tractor or vice versa, it will not work.

Hydraulic Tank, The Hydraulic Tank is mounted on the LH side of High Frame. It will be mounted by the Mounting tubes that are welded to the High Frame and the Tubes that are welded on to the Hydraulic Tank. There will be long bolts with Allen Heads that will be inserted down through these tubes.

Tank Mounted Counter Weight. There is a tank mounted counter weight that will be mounted on to the Hydraulic Tank useing Allen Head Bolts. There will be a cover that bolts on over counter weight.

A-Boom (JD 6615 / 7615 Asy Instruction Manual) 07/03

© 2003 Alamo Group Inc.

Section 4 - 6

Page 35
Image 35
Alamo DSEB-D16/SAS instruction manual High Frame Installation