High Frame Installation
Frame Rail Pre-Assembly: (continued)
High Frame Mounting Tube Components. (See Figure 4) These Components are Sitting in approx. position of assembly to illustrate where they are to be when tack welding them. Space is left between them for Illustration only, they will be closer together when assembled.
Also See Figure 3 on previous Page.
Bolts (3 each side)
Angle Mount (2 |
| |
each side) |
| |
| Mounting Tube | |
Frame | (1 each side) | |
Rail | Mounting Bolt Holes | |
| ||
| (2 each end) | |
Rear of |
| |
Frame Rail | Angle Mount | |
| ||
| (2 each side) | |
Bar Mounting | Front | |
Strap Cut Off | ||
of | ||
(2 each side) | ||
Frame | ||
| ||
Locknuts (3 each side) | Rail | |
Figure 4 | Bar Mounting | |
Straps | ||
|
High Frame and King Post Frame
Hydraulic Tank, The Hydraulic Tank is mounted on the LH side of High Frame. It will be mounted by the Mounting tubes that are welded to the High Frame and the Tubes that are welded on to the Hydraulic Tank. There will be long bolts with Allen Heads that will be inserted down through these tubes.
Tank Mounted Counter Weight. There is a tank mounted counter weight that will be mounted on to the Hydraulic Tank useing Allen Head Bolts. There will be a cover that bolts on over counter weight.
© 2003 Alamo Group Inc. | Section 4 - 6 |