Frame Rail Installation

Remove High Frame for Final Welding.:

1.Remove and Weld High Frame. Lift the High frame back up off of frame rails (See Figure 46). Finish Weld Mount Tubes. The Mounting Tubes are to be welded completely all the way around. This is why it is best to take High frame off, so that the Weld can done as strong as possible and in places that you can’t get to with High frame mounted on Frame rails. This is also recommended so Assemblies can be turned while welding to get maximum quality welds.

2.Welding Mounting Tubes all the way around. The Mounting Tubes must be welded to the High Frame all the way around, Turn High frame as required to weld all the way around (See Figure 49 & 50). These must be strong Welds.

Left Side of High

Frame &

Mounting Tube

Weld Solid all

the way around

Figure 47

Turning High frame to weld all the way

around Mounting Tubes.

Figure 49

Figure 46

Right Side of High

Frame &

Mounting Tube

 

Weld Solid all

Figure 48

the way around

 

 

 

Turning High frame to weld all the way

around Mounting Tubes.

Figure 50

A-Boom(JD 6615/ 7615 Asy Instruction Manual) 07/03

© 2003

Alamo Group Inc.

Section 4 - 21

 

Page 50
Image 50
Alamo DSEB-D16/SAS instruction manual Remove High Frame for Final Welding