Alamo DSEB-D16 Frame Rail Installation, Pre-Installing High Frame continued, Alamo Group Inc

Models: DSEB-D16 DSEB-D16/SAS

1 119
Download 119 pages 20.92 Kb
Page 43
Image 43
Manual background

Frame Rail Installation

Pre-Installing High Frame: (continued)

7.Align High frame to Frame Rails. The High Frame Vertical Tube should be as directly above the Vertical tube of the frame rails as possible (See Figure 30). The illustrations in figure 30 shows the High Frame not directly over the Frame Rail Vertical Tube, try to get it as directly over it as you can.

The height of the High frame should be no higher than the Cab of the Tractor. The horizontal tube of the High Frame should be just above the height of the horizontal Tube of the Frame Rail (See Figure 29 & 30)

Clamp the High frame to the Frame Rail when aligned and leveled. (See Figure 29). Leave the Hoist connected to the High frame for safety and additional support.

Frame Rail Tube & Frame Rail must be align parallel with each other up and down here

Figure 29

Frame Rail

Horizontal Tube

Machete High Frame

Vertical Tube

Set High

Frame in

Line with

Frame Rail

Vertical Tube

High Frame

Horizontal Tube

Support

Plate

as shown

Front

Support

Mount

Figure 30

Frame Rail leading to rear

Axle Housing of Tractor

Frame Rail

Vertical Tube

8.Re-check all alignment points. Re-check the alignment of the Frame Rails and High Frame for level mounting position. These components must be aligned now before any Tack welding begins.

A-Boom (JD 6615 / 7615 Asy Instruction Manual) 07/03

© 2003 Alamo Group Inc.

Section - 14

Page 43
Image 43
Alamo DSEB-D16/SAS instruction manual Frame Rail Installation, Pre-Installing High Frame continued, Alamo Group Inc