![](/images/new-backgrounds/1111323/11132367x1.webp)
Frame Rail Installation
Frame Rail Pre-Assembly: (continued)
High Frame Mounting Tube Components. (See Figure 3 & 4) These Components are to be laid out and will be tack welded to frame Rails and High frame during
High Frame Mounting Tube Componnets
1
Figure 3
| Machete High |
| 2 |
| Frame |
| |
| 2A |
| 1 |
|
|
| |
| RH Frame Rail |
| 4 |
| Front Shown |
| |
2 | 2A | 3 | Frame Rail |
(to Rear Axle) |
5
Cut Off | Width of Frame | |
Rail Tube | ||
|
Item | Part No. | Qty | Description |
1 | 2 | Mounting Tubes, (Length will Vary with Mount Kit). | |
| 02918600 | 4 | Bolt, 3/4" X 2" Long (Not Shown) |
| 00037200 | 4 | Locknut, 3/4" Toplock (Not Shown |
2 | 02966639 | 7 | Bar Mounting Strap |
2A | 02966639 | 1 | Bar Mounting Strap (Cut In Half) |
3 | 00037200 | 8 | Locknut, Toplock |
4 | 02957039 | 8 | Bolt, 3/4" X |
5 | 02966641 | 2 | Angle Mount |
© 2003 | Alamo Group Inc. | Section 4 - 5 |
|