Boom Swing Stop Installation
Boom Swing Stop installation:
1. | Position Boom Swing Stop Lug. BoomSwing |
Stop Log is used to prevent Boom from swinging back | |
to far and hitting Cab. With Boom folded and restin on | |
Boom Hook in Boom Rest Plate. Position the | |
BoomSwing Stop on King Post Mount behond the Lift | |
Cylinder Lug. (See Figure 10) This can be difficult to | |
hold heare while you tack it, it is important that it be | |
square and touch the Cylinder lug as shown. (See | |
Figure 10). | |
2. | Tack Weld Boom Swing Stop Lug. Tack |
Weld the Boom Swing Stop Lug to the King Post | |
Mount (DO Not Weld to the King Post). (See Figure 11) | |
Tack Wled the Lug secure enough that the Boom can | |
be swung out to the side, this gives you more rome to | |
weld on the Boom Swing Stop Lug completly(See | |
Figure 12) | |
3. | Weld Boom Swing Stop Lug Solid. After the |
Boom is swung out 90 deg. from tractor completly |
Boom Swing
Stop Lug
High Frame
FIGURE 10
King Post Lift
Cyl Lug
weld the Stop Lug to the King Post Mount on High |
frame (See Figure 12). Slowly swing th Boom inward |
to the Boom rest and make sure tha Boom cannot be |
swung in so far that it will hit the cab of tractor. This is |
a very critical step and must be done with extreme |
caution so as not to damage Cab of tractor. |
Tack Weld
Boom
Swing Stop
FIGURE 11
FIGURE 12
FIGURE 13