Boom Swing Stop Installation

Boom Swing Stop installation:

1.

Position Boom Swing Stop Lug. BoomSwing

Stop Log is used to prevent Boom from swinging back

to far and hitting Cab. With Boom folded and restin on

Boom Hook in Boom Rest Plate. Position the

BoomSwing Stop on King Post Mount behond the Lift

Cylinder Lug. (See Figure 10) This can be difficult to

hold heare while you tack it, it is important that it be

square and touch the Cylinder lug as shown. (See

Figure 10).

2.

Tack Weld Boom Swing Stop Lug. Tack

Weld the Boom Swing Stop Lug to the King Post

Mount (DO Not Weld to the King Post). (See Figure 11)

Tack Wled the Lug secure enough that the Boom can

be swung out to the side, this gives you more rome to

weld on the Boom Swing Stop Lug completly(See

Figure 12)

3.

Weld Boom Swing Stop Lug Solid. After the

Boom is swung out 90 deg. from tractor completly

Boom Swing

Stop Lug

High Frame

FIGURE 10

King Post Lift

Cyl Lug

weld the Stop Lug to the King Post Mount on High

frame (See Figure 12). Slowly swing th Boom inward

to the Boom rest and make sure tha Boom cannot be

swung in so far that it will hit the cab of tractor. This is

a very critical step and must be done with extreme

caution so as not to damage Cab of tractor.

Tack Weld

Boom

Swing Stop

FIGURE 11

FIGURE 12

FIGURE 13

A-Boom (JD 6615 / 7615 Asy Instruction Manual) 07/03

© 2003 Alamo Group Inc.

Section 13 - 4

Page 115
Image 115
Alamo DSEB-D16 Boom Swing Stop Installation, Boom Swing Stop installation, Tack Weld Boom Swing Stop Lug. Tack