Pre-Installing High Frame:

Frame Rail Installation

Pre-Installing High Frame:

1.High Frame Shipping Pallet. The High frame is shipped bolted to a Pallet, Do not unbolt this from the Pallet untill the Hoist has been connected to the High frame. The Hoist must be supporting the weight of the High Frame before any of the bolts holding High frame to pallet are removed.

2.Prepare High Frame for Lifting. There are two lift lugs welded to the top of the High frame for lifting it (See Figure 21). These Lugs will lift the bare High Frame straight without the King Post Sub-Assembly bolted to it. With the King Post Sub-Assembly bolted to the High Frame it will require you to adjust the length of the lifting chain and lifting point to balance the load (See Figure 22) and lift High frame level. High frame must be level when lifted over Frame rails.

3.Level High Frame. Use two magnetic Levels as shown. These magnets should be installed before lifting High frame.

The First Magnetic level is put on the Top of the High Frame on the Bottom Side (See Figure 23). This level will allow you to level the frame from left to right without having to climb up later to use a Level that you hold.

The Second Magnetic Level is put on the Kin Post Pivot toward the front of the tractor so that it will level the High Frame from front to rear as shown (See Figure 24).

Top of High Frame

Magnetic Level

Figure 23

Figure 21

Figure 22

 

Magnetic Level

King Post

Front of

Pivot Pin

Tractor

Figure 24

 

A-Boom (JD 6615 / 7615 Asy Instruction Manual) 07/03