Wire Harness / Valve Mounting 2 WD & 4 WD
Installing Wire Harness To Valve:
1.Wire Harness From Cab to Front. The wire harness runs out the bottom of the Cab on the right hand side. Run Harness along RH Frame rail of Tractor to the front of the Tractor (See Figure 19). Note the wire harness runs along with the hydraulic Hose from the Tractor Stack Valve to the front of the tractor. Do Not tie the Harness or Hoses to the Tractor frame rail at this time.
2.Wire Harness & Front Rail Support. The wire harness runs behind the front rail support on the RH side along side the hoses from the rear Tractor Stack valve. (See Fig- ure 20). Do not tie any hoses or wire harness at this time. Run Wire Harness along the front RH side untill it reaches the front of the Tank (See Figure 21)
4.Gaskets on Valve Terminals. There are 5 wire terminals on Valve, A Gasket will have to installed on each one. These gas- kets will only fit one way, there are 4 slots in gasket. 1 Slot is wider than the other 3, align these slots with correct terminal on Valve. (See Figure 22 & 23). These Gaskets must be used.
Wire
Harness
FIGURE 21
Wire Harness runs along
Tractor Frame Rails
FIGURE 19
Run Wire Harness |
behind frame support |
FIGURE 20 |
Plug |
Gaskets |
FIGURE 22
© 2003 Alamo Group Inc. | Section 9 - 8 |