Alamo DSEB-D16/SAS Remove High Frame for Welding. Continued, Frame Rail Installation, Do not weld

Models: DSEB-D16 DSEB-D16/SAS

1 119
Download 119 pages 20.92 Kb
Page 52
Image 52
Remove High Frame for Welding.: (Continued)

Frame Rail Installation

Remove High Frame for Welding.: (Continued)

6.The Side Rails. These Frame rails will be welded to the Rail Support Plates, so it will be necessary to scrape the paint off approxi- mately 5/8" of the base before attaching. Clamp Side Rails to Front Mount Supports. (See Figure 55). Tack-weld rails to Front Mount Brackets. After thorough check for hori- zontal and parallel location, weld a solid 1/4" fillet weld bead 8" long on both sides. (See Figure 56). Note that any Step Type Counter Weight must clear the Left Rear Tire.

NOTE: There is a Tire Limit, This should be addressed when ordering the Mount Kit designed to fit with the specified Tire Size. If larger than Tires specified for Mount Kit are installed, mount- ing kit may not fit.

7.The Pig Tail Brackets will be welded to the underside of the Rails, so it will be necessary to scrape the paint off from this area before attaching and welding them (See Figure 57). These Pigtails are to hold the Hoses up. Be sure to run the hoses for the Boom through these Pigtail rings.

NOTE: All parts are painted. When welding is required, scrape away the paint in the area to be welded to help assure the integrity of the weld. Repaint / Touch-up welded parts after finished welding.

Figure 55

1/4"

Figure 56

Figure 57

Pigtail Bracket

Weld here on

Do not weld

both sides.
Across the Tube.

3

 

Figure 58

Not Shown in
Actual Location

A-Boom(JD 6615/ 7615 Asy Instruction Manual) 07/03

© 2003

Alamo Group Inc.

Section 4 - 23

 

Page 52
Image 52