Hose Installation

Pump / Tank Hose Installation:

1.Suction Hose, Tank to Pump. The Suction hose connects to the front RH side of Tank (See Figure 8) and runs through a Hose Ring that is welded to the frame Rail (See Figure 9). The Suction Hose connects to the front Pump on the Left Hand Side of Pump (See Figure 10).

2.Connect Pressure Hoses. There are two pressure hoses that connect to the Pump. The Larger Hose (See Figure 10 & 11) runs through a weld on Hose Ring and to the Cutter Motor Control Valve (See Figure 12). The Small Hose runs to the Cyl. Control Valve. Connect the smaller hose to the pump and route with the larger hose.

From Tank

SUCTION HOSE

Hose Ring

To Pump

Figure 9

Tank Return

Tank SuctionHose Side

Hose Side

Front of Tank &

Front of Tractor

Figure 8

Tank Suction

Hose from Hyd.

Tank

Pump Pressure

 

Hose to Cutter

 

Motor Control Valve

Pump Pressure

 

 

Hose Side to Cyl.

Figure 10

 

 

Control Valve

Hose Ring

Pump Pressure

Hose to Cutter

Motor Control Valve

Figure 11

Pump Pressure

to Cutter / Motor

Valve

Figure 12

A-Boom (JD6615 / 7615 Asy Instruction Manual) 07/03

© 2003 Alamo Group Inc.

Section 7 - 4

Page 69
Image 69
Alamo DSEB-D16/SAS instruction manual Pump / Tank Hose Installation