Alamo DSEB-D16/SAS Pre-Install Mounting Tubes for High Frame continued, Frame Rail Installation

Models: DSEB-D16 DSEB-D16/SAS

1 119
Download 119 pages 20.92 Kb
Page 44
Image 44
Pre-Install Mounting Tubes for High Frame: (continued)

Frame Rail Installation

Pre-Install Mounting Tubes for High Frame: (continued)

 

Machete High

1

Frame

2A

RH Frame Rail

Front Shown

1

2

Figure 31

Item Part No.

1---Ref-----

02918600

00037200

202966639

2A 02966639

300037200

402957039

502966641

2

2A

 

2A

Frame Rail

4

(to Rear Axle)

 

 

 

 

6-3/4"

 

5

Cut one end off

Mounting

Tube Width

Qty Description

2Mounting Tubes, (Length may Vary with Mount Kit).

4Bolt, 3/4" X 2" Long (Not Shown)

4Locknut, 3/4" Toplock (Not Shown

6Bar Mounting Strap

2Bar Mounting Strap (Cut one end off LH Rail only)

8Locknut, Toplock

8Bolt, 3/4" X 10-1/2" Long

2Angle Mount (Front only)

9.Install Mounting Tubes . Loosely bolt the Front Angle Mount end of Mounting Tube (See Figure 32). Slide 1 Mounting Tube in on top of the Frame Rail on each side, the end that has the Angle Mount bolted to it goes to the Front away from the Tractor Cab. The mounting Tube should be slid back till the end of mounting tube is about 1/2" from the end of the Frame Rail. (See Figure 34). Do Not Tack Weld any components at this time. Note: in figure 32 note the location of High Frame Tube Height as compared to Mount- ing Tube Height, this is the way that it will appear as looking over the Hood of the Trac- tor toward LH Side.

High Frame

(LH Side)

Figure 32

Mounting

Tube

A-Boom(JD 6615/ 7615 Asy Instruction Manual) 07/03

© 2003

Alamo Group Inc.

Section 4 - 15

 

Page 44
Image 44
Alamo DSEB-D16/SAS Pre-Install Mounting Tubes for High Frame continued, Frame Rail Installation, Alamo Group Inc