Frame Rail Installation

Tack Welding Frame Rails: (continued)

4.Frame Stiffener Assembly. The frame stiffener is an assembly designed to run under the Tractor to tie the two Frame Rails together and support each other. The Gusset Rail Support is designed to stabilize the Frame Rails to the tractor frame. Re-check the left hand and right hand sides to make sure the alignment is still correct and the tack Welding has been performed.

 

Vertical Tube of RH Frame Rail

Front Wheel End

C-Clamp Here

 

 

 

 

 

Rear Axle End

Tack Weld here on both

 

Horizontal Tube

sides Front and Back only

 

Gusset Rail Support

after alignment

 

 

 

Align Flush with Bottom

 

Tack Weld Here

 

after final

of Vertical Tube

 

assembly only

RH Rail Stiffener Weldment (RH Side)

 

Rail Stiffener Tube Crossmember

 

 

 

LH Frame Rail is

LH Rail Stiffener Weldment

Mounted Here

Figure 39

(LH Side)

 

 

 

5.Locate Mounting Tubes and Hardware. See Figure 31 for breakdown of these components.

A.There will be one Mounting Tube for each side; these tubes are the same so it will not matter which is on which side. The Mounting Tubes are the same on either end. (See

Figure 31 - Item 1).

B.There will be 8 Bar Mounting Straps (Part # 02966639); these straps are the same but later in the assembly process 2 will have to be cut (See Figure 31 - Item 2 & 2A).

C.

There are 2 Angle Mounts (Part # 02966641), these have two holes in them and when

 

mounted the hole will be up. (See Figure 31 - Item 5).

D.There are 8 bolts (Part # 02957039) & Locknuts (Part # 00037200), the bolts are 3/4" X 10-1/2" Long (See Figure 31 - Item 4).

A-Boom (JD 6615 / 7615 Asy Instruction Manual) 07/03

© 2003 Alamo Group Inc.

Section 4 - 18

Page 47
Image 47
Alamo DSEB-D16/SAS instruction manual Mounted the hole will be up. See Item