1-32 Installationand Maintenance Volume
Octel 200/300 S.4.1 PB6001901
The following questions appear the same as in a regular installation.
5. NETWORK LOCATIONS.
6. NETWORK NUMBERING PLAN.
7. DISTRIBUTION LISTS.
Table PRELOADED from disk. UPDATE if necessary when INSTALL
is complete.
8. COS.
Table PRELOADED from disk. UPDATE if necessary when INSTALL
is complete.
9. INFORMATION TABLES.
Table PRELOADED from disk. UPDATE if necessary when INSTALL
is complete.
10. SCHEDULE TABLES.
Table PRELOADED from disk. UPDATE if necessary when INSTALL
is complete.
Continue with the questions as shown in INSTALL,until this message appears:
WARNING: FOR PROPER OPERATION SYSTEM MUST BE RESTARTED AFTER INSTALL!
INSTALL COMPLETE.
WAIT...DONE.
SAVE configuration to a DISKETTE? (Y/N, empty line = N).
:Y
DAY MM/DD HH:MM:SS YYYY SYSTEM NAME ID:000000 S/N:000000 PBX:00
−−−−−−−−−− SYSTEM INSTALLATION COMPLETED −−−−−−−
For correct operation, you must reload the Octel 200/300 after INSTALL. At the @ prompt, type:
RESTA 2 Enter