Installation 43
PB6001901 Octel 200/300 S.4.1
Moving the Equipment On-Site
Before moving the server, verify the status of the newsite:
-Is the input power ready?
-Is it the same as the input power required for the Octel 200/300?
-Is the installation location ready?
-Are the telephone extensions ready to be hooked up?
Move the Octel 200/300 server in the vertical, upright position on the shipping pallet. Be careful and
always remember that the Octel 200/300 is delicate electronic equipment.