6-36 Installationand Maintenance Volume
Octel 200/300 S.4.1 PB6001901

Ring-Through Test

The ring-through test runs only on demand and should be used only when the Octel 200/300 is initially
installed or when it is known that no calls are being processed.
The ring-through test performs the following sequence:
1. Seizes a port
2. Waits for dial tone from the PBX
3. Sends digits to a port using the extension number entered in the SLOTS Table
4. Waits for the port to answer,and sends a test pattern
For example, a four-port message server makes 12 test calls; each test call takes 20 to 30 seconds to
complete. If the port called is busy or does not answer,an error is logged in the Hardware Error Table.
The command for this test is TEST LINE 2. To initiate the test, at the @ prompt, enter:
TE L 2 Enter
Update Integration
The following changes tointegration slots require that the integration cards be restarted before the
changes take effect:
-Adding or deleting integration slots
-Modifying line appearances for an integration slot
-Enabling or disabling message waiting links
When any of these changes are made, the Octel 200/300 presents the following message when exiting
from the UPDATEprogram.
WARNING: FOR CHANGES TO TAKE EFFECT INTEGRATION MUST BE RESTARTED
To execute the command UPDATE INTEGRATION, at the @ prompt, enter:
UPINTG Enter
The Octel 200/300 then prompts the following:
RESTART INTEGRATION . . . ARE YOU SURE YOU WANT TO DO THIS?
This command restarts the integration cards and, therefore, disruptscall processing for approximately 1
or 2 minutes.