CONNECTING TO THE NETWORK
3.9.2Connecting an AUI Cable to an EPIM-X
NOTE |
The Signal Quality Error (SQE) switch remains in the OFF position for most network connections. However, some Data Terminal Equipment (DTE) requires SQE. Refer to your DTE manual for SQE requirement information.
To connect an
1.Verify that the SQE LED on the
NOTE |
If the SQE light remains on, even though the SQE switch is in the OFF position, contact Cabletron Technical Support.
2.Attach one end of an AUI cable, no longer than 50 meters in length, to the port located on the
ON Position |
| ON | |
(Toward Back | |||
| |||
of EPIM) |
|
OFF Position
(Toward Front
of EPIM)
OFF
Figure 3-12. The EPIM-X
|