Gateway 955 manual Setting Up Your Server

Models: 955

1 144
Download 144 pages 58.5 Kb
Page 22
Image 22
Manual background

Chapter 2: Setting Up Your Server

10 Attach one of the server rails to the front cabinet post using two of the medium screws and one nut bar, then attach the remaining rail to the other cabinet post.

Warning

Screws are required to support the front of the server. You must support the server while installing or removing the front screws and while sliding the server on or off the cabinet rails.

16

www.gateway.com

Page 22
Image 22
Gateway 955 manual Setting Up Your Server