Gateway 955 Follow the instructions in “Closing the server case” on page, Installing Components

Models: 955

1 144
Download 144 pages 58.5 Kb
Page 76
Image 76
11 Before inserting the processor into the socket, make sure that:
Apply thermal grease to the top of the processor, if necessary.

Chapter 4: Installing Components

10 If you are installing a processor into an empty processor socket that has an air dam installed, pinch the sides of the air dam together and lift it away from the socket.

11 Before inserting the processor into the socket, make sure that:

The processor release lever is open all the way (135° from the closed position)

The triangular arrow on the corner of the processor aligns with the triangular icon on the corner of the processor socket

Important

If you install two processors onto the system board, the processors must be the same speeds, revision, core voltage, and bus speed.

12 Install the new processor into the processor socket, then press the processor locking lever down until it lays flat against the processor socket.

13

14 Place the heat sink on the processor, then press the heat sink locking clips into place.

15 Follow the instructions in “Closing the server case” on page 48.

70

www.gateway.com

Page 76
Image 76
Gateway 955 manual Follow the instructions in “Closing the server case” on page, Installing Components