PV: Unused | PMT: Unused |
FV: Unused | R0: Unused |
R1: S1 | R2: S2 |
R3: S3 | R4: n |
R5: a | R6: b |
R7: c |
1.Key in the program and press CLEAR .
2.Divide the data points to be input into 3 equal consecutive groups. Label them Groups I, II and III for convenience.
3.Key in the first point of group I and press .
4.Key in the first point of group II and press .
5.Key in the first point of group III and press .
6.Repeat steps 3, 4, and 5 for the balance of the data in each group. After executing step 5 the display shows how many sets of data have been entered.
7.To fit the data to a Gompertz curve, press 12 . The resultant display is the curve constant "a". Constants "b" and "c" may be
obtained by pressing 6 and 7 respectively.
8.To calculate a projected value, key in the number of the period and press .
9.Repeat step 8 for each period desired.
Example: The
Year | Sales($K) |
1 | 18 |
2 | 41 |
3 | 49 |
4 | 151 |
5 | 188 |
6 | 260 |
7 | 282 |
8 | 322 |
9 | 340 |
What are the projected sales volumes for this product in its 10th and 12th year?What is the maximum yearly sales volume for this product if the
86