HP Z420 Workstation installation sequence recommendations

Table 3-6

Slot installation sequence

 

 

 

 

 

 

 

 

 

 

 

 

 

Load

Card description

Slot 1

Slot 2

Slot 3

Slot 4

Slot 5

Slot 6

order

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1

First PCIe graphic card

 

Only

 

 

 

 

 

 

 

 

 

 

 

 

2

Second PCIe graphic card

 

 

 

 

Only

 

or Tesla C2075

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3

Third PCIe graphic card

 

 

 

Only

 

 

 

 

 

 

 

 

 

 

4

Fourth PCIe graphic card

 

 

Only

 

 

 

 

 

 

 

 

 

 

 

5

SAS card

 

 

2nd

1st

3rd

 

 

 

 

 

 

 

 

 

6

PCIe 1394b card

1st

 

2nd

 

 

 

 

 

 

 

 

 

 

 

7

PCIe audio card

1st

 

2nd

3rd

4th

 

 

 

 

 

 

 

 

 

8

PCIe NIC card (LAN)

1st

 

2nd

3rd

4th

 

 

 

 

 

 

 

 

 

9

e-SATA bulkhead kit

 

 

2nd

3rd

 

1st

 

 

 

 

 

 

 

 

10

Second serial port kit

 

 

2nd

3rd

 

1st

NOTE: Slot sequenced from the rear I/O aperture to the board edge.

Component replacement guidelines

89

Page 101
Image 101
HP B5P07UT B5P07UT#ABA manual HP Z420 Workstation installation sequence recommendations, Slot installation sequence