Figure 10-6 A portion of the tasks listed by using the GUI

In Example 10-12,the list task command is used. This is an ESS CLI command.

Example 10-12 Using the list task command to list all saved tasks (only the last five are shown)

arielle@aixserv:/opt/ibm/ESScli > esscli list task -s 10.0.0.1 -u csadmin -p passw0rd

Wed Nov 24 10:29:31 EST 2004 IBM ESSCLI 2.4.0

 

Task Name

Type

Status

------------------------------------------------------------------------

H_Epath_test16

PPRCEstablishPaths

NotRunning

H_Epath_test17

PPRCEstablishPaths

NotRunning

Brocade_pr_lss10

PPRCEstablishPair

NotRunning

Brocade_pr_lss11

PPRCEstablishPair

NotRunning

Flash10041005

FCEstablish

NotRunning

 

 

 

10.10.2 Collecting the task details

Having collected the names of the saved tasks, the user needs to collect the contents of each task. If viewing tasks via the GUI, you can highlight each task and click the Information button to bring up the information panel for each task. An example is shown in Figure 10-7 on page 211.

210DS6000 Series: Concepts and Architecture

Page 234
Image 234
IBM DS6000 Series manual Collecting the task details, A portion of the tasks listed by using the GUI