DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si
555-230-123 Issue 1
April 1997
Maintenance Object Repair Procedures

Page10-392DATA-CHL (Network Control Data Channel)

10
Data Channel Dual Port RAM Test (#108)
This test is destructive.

This is a coordinated test of the dual port RAM that is shared between the

hardware and software composing the DATA-CON. Control messages and data

are passed through this dual port RAM to establish and tear down connections

over the DATA-CHLs. This test requests each side to read and write the dual port

RAM, first one at a time and then simultaneously in a lternate locations.

Table 10-108. TEST #107 Data Channel Reset Test
Error
Code Test
Result Description/Recommendation
1000 ABORT System resources required to run this test are not available.
1. Try the command at 1-minute intervals a maximum of 5 times.
2011
2012
2013
2016
2017
2020
2022
2030
ABORT Refer to STBY-SPE (Standby SPE) Maintenance documentation for a
description of these error codes.
2100 ABORT System resources required for this test are unavailable.
ABORT An ABORT has one of two different meanings:
1. System resources required to run this test are not available.
2. Internal system error
10704 ABORT Internal system error
1. Try the command at 1-minute intervals a maximum of 5 times.
Any FAIL The circuit pack failed to reset.
1. Execute the command again.
2. If the problem persists, replace the TN777 Network Control circuit
pack.
After the Network Control circuit pack has been replaced, its Time-of-Day
clock must be set using the set time command. If this is a high or critical
reliability system, set the Time-of-Day clocks as described in Chapter 6,
"Reliability Systems: A Maintenance Aid", to ensure t hat the clocks on both
Network Control circuit packs are synchronized.
PASS The ci rcuit pack initializes correctly.
Continued on next page