DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si
555-230-123 Issue 1
April 1997
Maintenance Commands and Trouble-Clearing Aids
Page8-397status bri-port
8
ASAI 0-63 Established blank blank Transitory state for ASAI
adjuncts. ASAI signaling is
connected at Layer 2. Layer 3
Restart procedure has not
completed between switch and
adjunct.
1. Check the adjunct by
following the recommended
repair procedures of the
manufacture r.
2. Verify the repair by
executing the status
bri-port PCSSpp
command. Determine that
the L2 state of the signaling
link is L3-Established.
BRI 0-126 Established ext blank Normal state for non-MIM
initializing, fixed and automatic
TEIBRI endpoints.
BRI, ASAI 64-126 Established blank blank Transitory state for automatic
TEIBRI endpoints which support
MIM initialization.
1. Verify that SPID
administration on the switch
and endpoint are
consistent. Verify the repair
by executing the status
bri-port PCSSpp
command. Determine that
the L2 state of the signaling
link is L3-Established.
Otherwise, proceed to Step
2.
2. Try replacing the endpoint.
Verify the repair by
executing the status
bri-port PCSSpp
command. Determine that
the L2 state of the signaling
link is L3-Established.
Table 8-3. Status BRI-Port Command Interpretation Continued
Endpoint
Types TEI
Range Layer 2 State Voice
Extension Service
SPID Description / Recommendation
Continued on next page