DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si
555-230-123 Issue 1
April 1997
Maintenance Commands and Trouble-Clearing Aids
Page8-658test sp-link
8
Description
The test sp-link command validates that the system printer li nk is administered
and runs a series of diagnostic tests that return results of the test along with
possible error codes to the user.
The system printer link is a link from the switch to an external printer over which
jobs can be printed. This link is created by administering the system printer
extension and setting up a call to the system printer.
Defaults
The default for the command is short.
Parameters
Help Messages
If the system technician presses HELP after entering "test sp-link", the following is
displayed:
Enter [’long’ or ’short’], [’schedule’]
Error Messages
If the system printer link is not administered, the following message is displayed:
Link not administered or not enabled
If during the execution of a command a resource problem occurs that requires
the user to restart the command, then the following message is displayed:
Command resources busy;
Press CANCEL to clear, and then resubmit
If all of the available maintenance resources are currently in use, then the
following message is displayed:
short This will cause the command to execute a series of nondestructive
diagnostic tests.
long This will execute a more comprehensive and longer version of the
diagnostic tests. This may involve both destructive and nondestructive
tests.
schedule When the "schedule" option is specified, the command is validated and
then a scheduling form is displayed to allow the technician to schedule
execution of the command. The command is then p laced in the
command queue and is executed at the specified time. The inf ormation
displayed by the command is sent to the system p rinter instead of the
screen. Refer to the Report Scheduler and System Printer feature
specification [1] for more details.