DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si
555-230-123 Issue 1
April 1997
Maintenance Commands and Trouble-Clearing Aids
Page8-400status bri-port
8
BRI
(cont’d)
0-126 L3-Assigned ext yes Transitory state for BRI
endpoints which support MIM
initialization when SPID Facility
Test was used to initialize the
station.
5. Wait for five seconds and
repeat the command. If the
state has not changed,
continue with Step 2.
6. Make sure SP ID
administration on the switch
and endpoints are
consistent. Verify the repair
by executing the status
bri-port PCSSpp
command. Determine that
the L2 state of the signaling
link is L3-Established.
Otherwise, go to Step 3.
7. Try replacing the endpoint.
Verify the repair by
executing the status
bri-port PCSSpp
command. Determine that
the L2 state of the signaling
link is L3-Established.
ASAI 0-126 Hyperactive ignore ignore Link has sent too many
messages per unit time.
Table 8-3. Status BRI-Port Command Interpretation Continued
Endpoint
Types TEI
Range Layer 2 State Voice
Extension Service
SPID Description / Recommendation
Continued on next page