
Section | Chapter 4. Trunks and Lines |
|
|
Installing T1 in a Double Cabinet with T1s in the Master and Slave
1.Install the Sync Unit in the master cabinet as described in Steps 1 and 2 under “Installation for a Single T1.”
2.Install a T1 MDF card in each cabinet. (See Step 3 on page
3.Set Switch 1 on the T1 cards. (See Step 4 on page
4.Install a T1 card in each “EC/TRK” slot.
5.Connect the Clock Sync Cable from CN4 on the
Note: Part Number
6.At the master cabinet, connect the Sync Cable from CN1 on the Sync Unit to CN5 on the T1 card (Figure
7.At each cabinet, connect the cable attached to CN3 on the T1 MDF card to CN3 on the T1 card (Figure
8.Using an RJ48 cable, connect CN1 of each T1 MDF card to a CSU. (See Figure
9.For both cabinets, connect the ground cable from the T1 MDF card as shown in Figure
DBS Manual - Revised April 2000 |