Section | Chapter 3. Cabinet Installation |
|
|
Grounding
Guidelines
•Before grounding the DBS, read the “Lightning Protection/Grounding” requirements beginning on page
•The ground cable must be at least 18 AWG.
•Resistance to ground must be 10 Ohms or less.
Installation
1.Attach the ground cable to the ground screw on the front of the power supply.
2.Connect the ground cable to the building ground.
Figure |
|
|
|
|
|
|
|
|
| |
|
|
| C N 11 | SW 1 C N 3 | C N 5 C N 4 | C N 2 |
|
|
| |
|
|
|
|
|
|
| ||||
|
|
|
|
| C N 13 | C N 14 |
| C N 6 |
|
|
|
|
|
| C N 12 |
|
|
|
| ||
|
|
|
|
|
|
|
|
|
| |
|
|
| C N 1 |
|
|
|
|
|
|
|
TRK1 | TRK2 | TRK3 | EC1 EC2 | EC3 EC4 EC5 | EC6 EC7 | EC8 EC/TRK | SCC | CPC | AUX1 | AUX2 |
| G round Screw |
|
|
|
|
|
|
| ||
|
| DBS Manual - Revised April 2000 |
|
|