Panasonic CPC-EX manual Maximums, T1 Hardware requirements for double-cabinet systems

Models: CPC-EX

1 204
Download 204 pages 19.37 Kb
Page 60
Image 60

Chapter 4. Trunks and LinesSection 300-Installation

Table 4-7. T1 Hardware requirements for double-cabinet systems

T1

CPC-B V4

SCC-B

T1 Trunk

T1 MDF

Sync

T1 Cable

Cable Kit

Location

(VB-43411)

(VB-

Card

Card

Card

(VB-

(VB-43110)

 

(See Note

43421)

(VB-

(VB-

(VB-

43564)

(See Note

 

 

 

 

1.)

(See Notes

43561)

43562)

43563)

 

4.)

 

 

2 and 3.)

 

 

 

 

 

 

 

 

 

 

 

 

 

T1 in the

1

1

1

1

1

0

1

Master

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

T1 in the

1

1

1

1

1

1

1

Slave

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

T1 in both

1

1

2

2

1

1

1

Master

 

 

 

 

 

 

 

and

 

 

 

 

 

 

 

Slave

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Notes:

 

 

 

 

 

 

 

1. Version 1.3 of the Bus Processor Unit (BPU) chip is required for T1.

2. An MFR card is required for DID/DNIS if DTMF signaling is used. If DID/DNIS is provided through DP sig- naling, an MFR card is not required.

3. SCC-B with ROM 1.3 or later is required if the central office does not provide T1 dial tone.

4. Version 1.2 of the Cable Kit is required for T1.

The T1 trunk card must be installed in the “EC/TRK” slot.

The installer must provide a Channel Service Unit (CSU) that complies with FCC Part 15 and Part 68. The CSU is installed between the DBS and the public network. The CSU provides alarm, diagnostic, and monitoring functions, as well as network protection.

The CSU must be compatible with the framing format (SF or ESF) that is provided by the public network.

Maximums

One T1 card can be installed per cabinet.

The number of T1 cards that can be installed in double-cabinet systems depends on the sizes of the connected systems. Table 4-12 on page 4-15shows T1 maximums for double-cabinet systems.

Note: The DBS 72 + DBS 40 combination does not support T1.

 

 

 

 

4-12

DBS Manual - Revised April 2000

DBS-2.3/9.2-300

Page 60
Image 60
Panasonic CPC-EX manual Maximums, T1 Hardware requirements for double-cabinet systems