Chapter 5. Peripheral Equipment | Section |
|
|
4.Connect the “R” and “T” leads to a digital extension port on the DBS.
5.Connect the “GND” lead on the OPX Adaptor to the DBS Frame Ground screw.
6.Connect the “TR” and “TT” leads to the OPX station.
7.Install the cover on the OPX Adaptor.
8.Turn the system off and back on, or unplug the cable connected to the digital extension and then plug it back in.
Installing an OPX Station Through a Central Office
1.Perform Steps 1 through 5 of “Installing an OPX Station Without Going Through a Central Office” on page
2.Connect the “TR” and “TT” leads to the central office.
Note: If the central office requests a ground on the tip side of the OPX, strap Pins 1 to 2 on CN3.
3.If the ringing level at the OPX station is not sufficient, connect a ringing supply to the
Note: Signals to the external ringer should not exceed 300
4.If a ringing supply is used, cut Straps J1 and J2 on the OPX Adaptor.
5.Install the cover on the OPX Adaptor.
6.Power the system down then back up, or unplug the cable connected to the digital extension, then plug it back in.
|
|
|
|
DBS Manual - Revised April 2000 |