Pelco System 9760 Verifying CM9760-MXB Component Installation, Sample Downframe Cable Connections

Models: System 9760

1 148
Download 148 pages 41.95 Kb
Page 23
Image 23

CM9760-MXB BAY 1

CM9760-MXB BAY 2

Alarm

Black

 

Out

RS-422

RS-422

Alarm

Black

 

Out

RS-422

RS-422

CAMS 1-256

RPC

RPC

SUPPLIED DOWN-

OR

FRAMING CABLES

16X RIBBON COAXIAL

DFC

DFL

 

Figure 7. Sample Downframe Cable Connections

VERIFYING CM9760-MXB COMPONENT INSTALLATION

Up to 16 CM9760-VCC video input cards, one CM9760-VMC video output card, and up to two power supplies are installed in a matrix bay at the factory as ordered. Verify component installation as follows:

1.Remove the front panel of the matrix bay to view the video input and output cards.

2.Verify that the correct number of cards and power supplies are installed. In addition, verify that each installed card and power supply is properly seated in the matrix bay.

Refer to the following sections for detailed information.

C1572M (9/05)

23

Page 23
Image 23
Pelco System 9760 manual Verifying CM9760-MXB Component Installation, Sample Downframe Cable Connections