UPS INSTALLATION PLAN AND UNPACKING

For an UPS with common rectifier input terminals, E1 through E12 are 2-hole bus bar mountings for standard NEMA 2-hole barrel lugs. The power wiring connections for this equipment are rated at 90°C. See Table 3-9for external power cable terminations, Table 3-10for supplied external wiring terminal hardware, and Table 3-11for recommended installation parts and tools not supplied by Eaton Corporation.

For an UPS with separate rectifier input terminals for the UPMs, E1 through E3 are pressure terminations, UL and CSA rated at 90°C. See Table 3-12on page 3−14 for these power cable terminations.

Figure 4-20through Figure 4-26starting on page 4−24 show the location of the power cable terminals inside the UPS.

Table 3-9. UPS External Power Cable Terminations for the Powerware 9395−825/650, 9395−825/750, and 9395−825/825

Terminal Function

Terminal

Function

Bus Landings

Tightening Torque

Bolt Size

(using both sides of bus)

Nm (lb ft)

 

 

 

 

 

 

 

 

 

 

 

E1

Phase A

4 – 2 bolt mounting

76 (56)

M12

 

 

 

 

 

 

AC Input to UPS Rectifier

E2

Phase B

4 – 2 bolt mounting

76 (56)

M12

 

 

 

 

 

 

 

E3

Phase C

4 – 2 bolt mounting

76 (56)

M12

 

 

 

 

 

 

 

E6

Phase A

6 – 2 bolt mounting

76 (56)

M12

 

 

 

 

 

 

AC Input to Bypass

E7

Phase B

6 – 2 bolt mounting

76 (56)

M12

 

 

 

 

 

 

 

E8

Phase C

6 – 2 bolt mounting

76 (56)

M12

 

 

 

 

 

 

 

E9

Phase A

6 – 2 bolt mounting

76 (56)

M12

 

 

 

 

 

 

AC Output to Critical Load

E10

Phase B

6 – 2 bolt mounting

76 (56)

M12

 

 

 

 

 

 

 

E11

Phase C

6 – 2 bolt mounting

76 (56)

M12

 

 

 

 

 

 

DC Input from Battery or Battery

E4

Battery (+)

12 – 2 bolt mounting

76 (56)

M12

Disconnect to UPS – Common

 

 

 

 

 

E5

Battery (−)

12 – 2 bolt mounting

76 (56)

M12

Battery

 

 

 

 

 

 

 

 

 

 

 

DC Input from Battery or Battery

E4

Battery (+)

4 – 2 bolt mounting

76 (56)

M12

Disconnect to UPS – Separate

 

 

 

 

 

E5

Battery (−)

4 – 2 bolt mounting

76 (56)

M12

Battery (UPM 1)

 

 

 

 

 

 

 

 

 

 

 

DC Input from Battery or Battery

E4

Battery (+)

4 – 2 bolt mounting

76 (56)

M12

Disconnect to UPS – Separate

 

 

 

 

 

E5

Battery (−)

4 – 2 bolt mounting

76 (56)

M12

Battery (UPM 2)

 

 

 

 

 

 

 

 

 

 

 

DC Input from Battery or Battery

E4

Battery (+)

4 – 2 bolt mounting

76 (56)

M12

Disconnect to UPS – Separate

 

 

 

 

 

E5

Battery (−)

4 – 2 bolt mounting

76 (56)

M12

Battery (UPM 3)

 

 

 

 

 

 

 

 

 

 

 

DC Input from Battery or Battery

E4

Battery (+)

4 – 2 bolt mounting

76 (56)

M12

Disconnect to UPS – Separate

 

 

 

 

 

E5

Battery (−)

4 – 2 bolt mounting

76 (56)

M12

Battery (UPM 4 FI−UPM)

 

 

 

 

 

 

 

 

 

 

 

Input and Output Neutral

E12

Neutral

12 – 2 bolt mounting

22 (16)

M10

 

 

 

 

 

 

Customer Ground

Ground

Ground

15 – 1 bolt mounting

22 (16)

M10

 

 

 

 

 

 

NOTE Customer ground, sized in accordance with NEC Table 250.122, can be run in any conduit listed in Table 3-13on page 3−15.

EATON Powerware® 9395 UPS (650–825 kVA) Installation and Operation Manual S 164201725 Rev 2 www.powerware.com

3−13

Page 35
Image 35
Powerware 650825 kVA Terminal Function Bus Landings Tightening Torque Bolt Size, M12, AC Input to UPS Rectifier, Battery