INSTALLING OPTIONS AND ACCESSORIES

5.3Installing an Optional Remote Monitor Panel II

To install RMP II wiring:

1.Verify the UPS system is turned off and all power sources are removed. See Chapter 7,

2.Perform the procedure listed in paragraph 5.1.

NOTE If mounting to a hollow wall, secure the enclosure to a wood or metal stud within the wall. Do not use hollow wall anchors.

3.Securely mount the RMP II at the desired location. See Figure 5-12on page 5−15 for mounting hole locations.

NOTE When installing signal wiring for CAN card J3 terminals, conduit must be installed between the device and the UPS cabinet.

4.Remove the ISBM cabinet top right interface conduit landing plate to drill or punch conduit holes (see Figure 4-18on page 4−20).

5.Reinstall the conduit landing plate.

6.Install conduit between the UPS and RMP II. See Figure 5-12on page 5−15 for RMP II knockout hole location.

7.Install wiring between the UPS and RMP II. See Figure 5-2and Table 5-1for the Powerware Hot Sync CAN Bridge Card terminal location and wiring information, and Figure 5-7, Figure 5-8,and Table 5-5for the RMP II terminal location and wiring information.

NOTE 120 Vac for the RMP II should be supplied from the critical bus by facility planners or the customer.

8.Install 120 Vac power wiring from the critical bus to the RMP II. See Figure 5-7, Figure 5-8,and Table 5-5for the terminal location and wiring information.

9.Close the front door and secure the latch.

10.Restart the UPS. See Chapter 7, instructions.

EATON Powerware® 9395 UPS (650–825 kVA) Installation and Operation Manual S 164201725 Rev 2 www.powerware.com

5−9