UPS SYSTEM INSTALLATION

Left Top Panel

Left Middle Panel

Interior Left

Side Panel

Corner Channel

UPM Section

Wireway Panel

Figure 4-5. Section Joining

5.Remove the screws securing the left top panel and remove the panel (see Figure 4-5). Retain the hardware for later use.

6.Remove the screws securing the left middle panel and remove the panel (see Figure 4-5). Retain the hardware for later use.

C A U T I O N

Use care during installation to protect components mounted on the right side of the ISBM section and the intercabinet wiring harnesses attached to the left side UPM section from damage.

NOTE Clearance between the ISBM and the UPM sections must be less than 1/2" so that joining brackets can be installed.

7.Using a forklift with the forks in the front forklift slots, position the ISBM section adjacent to the left side of the previously installed UPM section. Verify that the ISBM section right side is against the UPM section left side and the front of the cabinet bases are flush with each other (see Figure 4-6).

8.Reinstall the corner channel (see Figure 4-5)and secure using the retained hardware.

9.Reinstall the left middle panel (see Figure 4-5)and secure using the retained hardware.

4−6

EATON Powerware® 9395 UPS (650–825 kVA) Installation and Operation Manual S 164201725 Rev 2 www.powerware.com

Page 52
Image 52
Powerware 650825 kVA operation manual U T I O N