UPS INSTALLATION PLAN AND UNPACKING

4.Remove the protective covering from the cabinets.

5.Remove the packing material, and discard or recycle in a responsible manner.

6.Inspect the contents for any evidence of physical damage, and compare each item with the Bill of Lading. If damage has occurred or shortages are evident, contact an Eaton service representative immediately to determine the extent of the damage and its impact on further installation.

NOTE While waiting for installation, protect the unpacked cabinets from moisture, dust, and other harmful contaminants. Failure to store and protect the UPS properly may void your warranty.

Figure 3-11. UPS Cabinet as Shipped on Pallet (ISBM Section)

3−22

EATON Powerware® 9395 UPS (650–825 kVA) Installation and Operation Manual S 164201725 Rev 2 www.powerware.com

Page 44
Image 44
Powerware 650825 kVA operation manual UPS Cabinet as Shipped on Pallet Isbm Section