UPS SYSTEM INSTALLATION

NOTE For the following steps, verify that the forklift or pallet jack is rated to handle the weight of the cabinet (see Table 3-1on page 3−2 for cabinet weight).

1.If not already accomplished, use a forklift or pallet jack to move the ISBM and UPM sections to the installation area, or as close as possible, before unloading from the pallets. If possible, move each section using the pallet. Insert the forklift or pallet jack forks from the right side of the pallet (facing the cabinet), between the supports on the bottom of the pallet (see Figure 3-8and Figure 3-9on

page 3−6 for the ISBM and UPM section center of gravity measurements). If the sections must be moved using the cabinet front or rear fork lift slots, see the caution statements at the beginning of this procedure.

2.Remove the three bolts securing the left side shipping bracket to the cabinet and three bolts securing the bracket to the pallet (see Figure 4-1or Figure 4-3). Remove the left side shipping bracket.

3.Remove the three bolts securing the right side shipping bracket to the cabinet and three bolts securing the bracket to the pallet (see Figure 4-2or Figure 4-4). Remove the right side shipping bracket.

Front Door

Shipping Bracket Bolts

Shipping Bracket

Bolts

Pallet

Left Side Shipping

Bracket

Figure 4-1. Removing the ISBM Section Left Side Shipping Bracket

4−2

EATON Powerware® 9395 UPS (650–825 kVA) Installation and Operation Manual S 164201725 Rev 2 www.powerware.com

Page 48
Image 48
Powerware 650825 kVA operation manual Removing the Isbm Section Left Side Shipping Bracket