INSTALLING OPTIONS AND ACCESSORIES
NOTE Setup of the Powerware Hot Sync CAN Bridge Card must be performed by an authorized Eaton
Customer Service Engineer. Contact an Eaton service representative to schedule a date.
11.To check the operation of the RMP II, ensure that the UPS is supplying the load via inverter or bypass. If the indicators on the RMP II show the appropriate status, then it is operating correctly.
If the communication link between the UPS and the RMP II is not present, the RMP II performs a
12.To test the indicator lamps, press and hold the horn silence pushbutton for three seconds. All lamps should illuminate, and the horn sounds continuously until you release the pushbutton.
5.4Installing an Optional Relay Interface Module II
To install RIM II wiring:
1.Verify the UPS system is turned off and all power sources are removed. See Chapter 7,
2.Perform the procedure listed in paragraph 5.1 on page 5−1.
NOTE If mounting to a hollow wall, secure the enclosure to a wood or metal stud within the wall. Do not use hollow wall anchors.
3.Securely mount the RIM II at the desired location. See Figure
NOTE When installing signal wiring for CAN card J3 terminals, conduit must be installed between the device and the UPS cabinet.
4.Remove the ISBM cabinet top right interface conduit landing plate to drill or punch conduit holes (see Figure
5.Reinstall the conduit landing plate.
6.Install conduit between the UPS and RIM II. See Figure
7.Install wiring between the UPS and RIM II. See Figure
NOTE 120 Vac for the RIM II should be supplied from the critical bus by facility planners or the customer.
8.Install 120 Vac power wiring from the critical bus to the RIM II. See Figure
9.Close the front door and secure the latch.
EATON Powerware® 9395 UPS | 5−11 |