June 30, 2006 Chapter 1: Overview
SG1-UM-8500-03 1-3
Identify any required procedures and tests.
On an equipment plan, make a preliminary decision that locates each of the SG-1 chassis that you plan
to install.
Read this manual, whether you are replacing or adding a SG-1 chassis that is being installed.
Verify the list of replaceable parts for the installation (screws, bolts, washers, and so on) so that the parts are
identified (see Table 1-1 on page 1-4).
Check the required tools list to make sure the necessary tools are available (see “Required Tools and Equip-
ment” on page1-5).
Purchase necessary parts.
Identify work steps and any necessary notifications to CO personnel or engineers before work begins.
Perform the installation (see Chapter 2: Installation).
UNPACKING AND CHECKING THE CONTENTS OF YOUR SHIPMENT
The shipping package for the SG-1 chassis is designed to reduce the possibility of product damage associated with
routine material handling experienced during shipment. To reduce the potential damage to the product, transport the
chassis in its ADC-specified packaging. Failure to do so may result in damage to the chassis. Do not remove the
chassis from its shipping container until you are ready to install it.
Table 1-1 on page 1-4 provides a list of required and optional components that may not be included in the SG-1
chassis kit, but are either required or recommended for the SG-1. A notes section (Table 1-2 on page 1-4) has been
provided to document any components not listed below.
Note: Do not discard the packaging materials used in shipping your SG-1 chassis. You will need the
packaging materials in the future if you move or ship your SG-1 chassis.