![](/images/new-backgrounds/1266963/26696333x1.webp)
June 30, 2006 | Chapter 1: Overview |
REQUIRED TOOLS AND EQUIPMENT
The following tools are required to install the
•Grounding or
•No. 2
•Multimeter (for continuity testing)
•Wire stripper
•
•Box cutter
•#26 AWG wire
SPECIFIC SG-1 CHASSIS INSTALLATION REQUIREMENTS
The
•Height of 17.50 inches (44.4 cm) (10U)
•Width of 19.0 inches (44.8 cm) without rack adapters attached to the left and right side of the unit
•Depth of 11.4 inches (28.9 cm)
IMPORTANT | Observe the clearances specified below in “Location Requirements” to provide proper air flow | |
! | ||
for chassis cooling. |
Location Requirements
To install the chassis in an equipment room or central office:
•Install in a
•Allow a
Use the following card types in the
•Fast Ethernet card in slots 1 through 16
•Gigabit Ethernet card in slots 1 through 16
•ATM card in slots 1 through 16
•Rear I/O card on the rear of the chassis in slots 1 through 16
When selecting system components, consider future expansion of your