ADC user manual Required Tools and Equipment, Specific SG-1 Chassis Installation Requirements

Models: SG-1

1 226
Download 226 pages 28.6 Kb
Page 17
Image 17

June 30, 2006

Chapter 1: Overview

REQUIRED TOOLS AND EQUIPMENT

The following tools are required to install the SG-1 chassis:

Grounding or ESD-preventive wrist strap

No. 2 Phillips-head screwdriver

Multimeter (for continuity testing)

Wire stripper

Wire-wrap tool

Box cutter

#26 AWG wire

SPECIFIC SG-1 CHASSIS INSTALLATION REQUIREMENTS

The SG-1 chassis dimensions are:

Height of 17.50 inches (44.4 cm) (10U)

Width of 19.0 inches (44.8 cm) without rack adapters attached to the left and right side of the unit

Depth of 11.4 inches (28.9 cm)

IMPORTANT

Observe the clearances specified below in “Location Requirements” to provide proper air flow

!

for chassis cooling.

Location Requirements

To install the chassis in an equipment room or central office:

Install in a 19-inch, 23-inch, 24-inch, or 600 mm rack using the customer provided rack adapter brackets.

Allow a 1-inch minimum clearance between the chassis to provide for proper air flow for cooling.

Use the following card types in the SG-1 chassis:

Fast Ethernet card in slots 1 through 16

Gigabit Ethernet card in slots 1 through 16

ATM card in slots 1 through 16

Rear I/O card on the rear of the chassis in slots 1 through 16

When selecting system components, consider future expansion of your SG-1 with items in Table 1-3as possible options.

SG1-UM-8500-03

1-5

Page 17
Image 17
ADC user manual Required Tools and Equipment, Specific SG-1 Chassis Installation Requirements, Location Requirements